BILL N0.10 - SAFETY IN ROAD CONSTRUCTION ZONE
|
10.01
|
Supplying and fixing sign boards including the cost of posts, fixture foundation,
fitting and fixing. Sheeting will be made of encapsulated lens type of Retro-reflective
type and messages/ borders will be screen printed complete as per Technical Specification
Clauses 112 & 801 and as directed by Engineer
|
|
|
|
|
Octagonal 900x 900 mm
|
No.
|
20
|
5
|
|
Circular 600 dia
|
No.
|
15
|
19
|
|
Informatory as per drawing
|
Sq.m
|
30
|
16.2
|
|
Cautionary warning signs (Triangular 900 sides)
|
No.
|
15
|
9
|
10.02
|
Providing of red fluorescent with white reflective sleeve traffic cone made of low
density polyethylene(LDPE) material with a square base of 90x390x35mm and a height
of 770mm, 4Kg in weight, placed at l.Sm ntcrval, all as per BS 873 including cost
of all materials, labour, loading, unloading, lead, lift, transporting etc complete
Technical Specification Cl. 1 12 & IRC SP 55-2001
|
No.
|
150
|
50
|
10.03
|
Installation of a steel portable barricade with horizontal rail 300mm wide, 25m
in length fitted on a frame made with 45X45X5 mm angle iron section, 1.5m in height,
horizontal rail painted(2coat) with yellow and white strips, 150mm in width at angle
of 45degree, A frame painted with 2 coats of yellow paint, complete as per IRC:SP:55-2001
including cost of al1 materials, labour, loading, unloading, lead, lift, transporting
etc Complete;. as per Technical specification Cl. 112
|
No.
|
50
|
-
|
10.04
|
Provision of metal drum/empty bitumen drum delineator, 300mm in diameter,800mm high,
filled with earth for stability, painted in circumferential strips of alternate
black and white 100mm wide 2 coats ted with reflectors 3 Nos of 7.5cm dia, all as
per IRC:SP:55-2001 inluding cost of all materials, labour, loading, unloading, lead
lift, transporting etc., complete as per Technical Specification Cl. 112
|
No.
|
150
|
50
|
10.05
|
Providing plastic crash barrier as per drawing and per the directions of the Engineer(1000x490x780MM
size)(LWH) as per Technical Specification Cl. 112
|
No.
|
75
|
50
|
10.06
|
Providing Barricading/Caution Tapes of High quality PVC tape tube type to Enclose
construction area as per Technical Specification Cl. 112
|
Lm
|
2,500
|
800
|
Bill. No. 11. Implementation of Environmental Management Action Plan to be executed
under Civil Works Contract
|
11.01
|
A. Carting away the unserviceable materials from work site to the neare disposal
site (up to a lead of 10km) and disposing the same in dispos pits or borrow areas
including depositing unserviceable materials in laye and manual compaction as per
Technical Specification Clause.111
|
Cum
|
33,962
|
8,000
|
|
B. The 30 cm top layer of disposal pit shall be provided with good eartl
suitable for development of vegetation/plantation. All work shall b carried out
as per specifications and approval of the Engineer in Charge as per Technical Specification
Clause.111
|
Sq.m.
|
32,049
|
-
|
11.02
|
Turfing at ground level at disposal pits for un-serviceable material as per specifications
and approval of the Engineer in Charge as per Technica Specification Clause.111
|
Sq.m
|
32,049
|
-
|
11.03
|
Regular water sprinkling (at least 4 times) per day at all construction sites or
suppression of visible dust levels, s per Technical Specification Clause. 111
|
Km
|
29.00
|
9.255
|
11.04
|
Construction of Recharge pits within the selected water bodies along the iroject
road as per approved design and drawing as developed by Central Ground Water Board
as per Technical Specification Clause. 111 and as er Drawing no.U/T/16
|
Nos.
|
18
|
-
|
11.05
|
Construction of silt traps at the discharge points of channels into to fresh ater
bodies across the project road as per the Standard Details providec n the as per
Technical Specification Clause. 111 and as per Drawing O.UHV16
|
M
|
18
|
-
|
11.06
|
Providing Informatory sign boards (Informatory /caution messages) for oad users
for providing information about ecologically sensitive areas, ild life crossing
points (if any), important tourist locations, etc as pplicable. The specifications
of sign boards shall conform to relevant 1C specifications. The locations for Informatory
sign boards are given in per Technical Specification Clause. 111
|
Sq.m
|
2
|
-
|
11.07
|
Construction of 30cm thick clay lined (at bottom and sides) pits for safe disposal
of scarified bitumen including carriage (up to a lead of 10km) depositing bitumen
in layers of 15 cms with manual compaction am covering the pit with 20cm thick good
earth as top layer at ground level all complete as per Typical Drawing as
per Technical Specification Clause. 111 and as per Drawing no.U/T/17
|
Nos
|
21
|
-
|
11.08
|
Turfing at ground level at disposal pits for scarified bitumen as pe specifications
and approval of the Engineer in Charge.
|
Sq.m
|
7,098
|
-
|
11.11
|
Periodic air quality monitoring during construction stage at construction Camp sites,
bitumen hot mix plants, crusher plants (if specifically stablished for Project),
at major settlement areas along project road. The parameters to be monitored are
SPM, RPM, S02, NQx and CO, Lead. Each' monitoring schedule shall be over a duration
of 24 hours (in 8 hour Shifts), once in four months and for 2 Years. The tests are
to conducted in accordance CPCB norms and as per Technical Specification Clause.
111
|
Nos.
|
48
|
12
|
11.12
|
Utilisation of unserviceable material obtained from Road way excavation for widening
and construction of Cross roads as per Technical Specification Clause.111
|
Cum
|
2,000
|
-
|
11.13
|
Water quality monitoring during construction phase The sampling shall be carried
out once in four months for 2 years and cover all parameters as pe IS 10500 including
heavy metals as per Technical Specification Clause. 111
|
Nos.
|
18
|
3
|
11.14
|
Noise quality monitoring at specified silent receptors along Project Road at construction
camp sites, bitumen hot mix plants, crusher plants( specifically established for
Project), and at major settlement areas along Project road. - Each monitoring schedule
shall be over a duration of 2hours (6Am to 6PM), once in four months and for 2 Years).
The monitoring shall be carried out in accordance with CPCB norms at locations given
as per Technical Specification Clause. 111
|
Nos.
|
48
|
29
|
11.15
|
Soil quality monitoring at construction camp sites, work shop areas oil/lubricant
handling areas, bitumen hot mix plants, at all parking lay byes, vehicle servicing
stations along Project Road. Parameters shal nclude Ph, Nitrogen, Phospor and carried
out once in a quarter at all locations for 2 years as per details given as per Technical
Specification Clause. 111
|
Nos.
|
28
|
3
|
11.16
|
Providing Oil Interceptors at the fuel/oil storage camps or Construction Camps as
per Typical Drawing and as per Technical Specification Clause.111 and as per Drawing
no.U/T/20
|
Nos.
|
1
|
-
|
11.17
|
Providing Personal Protective Equipment to labours during construction tiase of
the project as per Technical Specification Clause. 111 Provision for two health
check ups for the carcinogens from bituminous
|
cost/ person/ annum
|
100
|
50
|
11.18
|
Provision for two health check ups for the carcinoens from bituminois fumes, which
may inhaled during road paving works. The first health teck up prior to induction
of the personnel into the construction works and the last health check up prior
to the discharge of the personnel from the construction works as per Technical Specification
Clause. 111
|
cost/ person
|
100
|
-
|