BILL NO. 10: SAFETY IN ROAD CONSTRUCTION ZONE
|
10.01
|
Supplying and fixing sign boards including the cost of posts, fixtures, foundation
fitting and fixing, sheeting will be made of encapsulated lens type of Retro-reflective
type and messages.
|
|
|
|
a)
|
Octagonal 900 x 900mm
|
No.
|
40
|
40
|
b)
|
Circular 600 dia
|
No.
|
30
|
30
|
c)
|
Informatory as per drawing
|
Sqm
|
60
|
58.44
|
d)
|
Cautionary warning sings ( Traingular 900 sides)
|
No.
|
30
|
30
|
10.02
|
Providing of red fluorescent with white reflective sleeve traffic cone made of low
density polyethylene (LDPE) material with a square base of 390 x 390 x 35mm and
height of 770mm, 4 kg in weight, placed at 1.5m
|
No.
|
300
|
285
|
10.03
|
Installation of a steel portable barricade with horizontal rail 300mm wide, 2.5m
in length fitted on a frame made with 45x45x5 mm angle iron section, 1.5m in height
horizontal rail painted (2coat) with yellow and white strips, 150mm in width at
angle of 45 degree, Aframe painted with 2 coats of yellow paint, complete as per
IRC:SP:55-2001 ncluding cost of all materials, labour, loading, unloading, lead,
lift, transporting etc omplete sa per Technical Specification Cl.112
|
No
|
100
|
95
|
10.04
|
Provision of metal drum/empty bitumen drum delineator, 300mm in diameter,800mm high,
filled with earth for stability, painted in circumferential strips of alternate
black and white 100mm wide 2 coats fitted with reflectors 3 Nos of 7.5cm dia,all
as per IRC:SP:55-2001 including cost of all materials, labour, loading, unloading
lead lift, transporting etc., complete as per Technical Specification Cl.112
|
No
|
300
|
40
|
10.05
|
Providing plastic crash barrier as per drawing and per the directions of the Engineer
(1000X490X780MM size)(LWH) as per Technical Specification Cl.112
|
No.
|
150
|
140
|
10.06
|
Providing Barricading/Caution Tapes of High quality PVC tape tube type to Enclose
construction area as per Technical Specification Cl.112
|
Lm
|
5,000
|
5,000
|
BILL NO. 11: Implementation of environmental Management action plan to be executed
under Civil works Contract
|
11.01
|
A) Carting away the unserviceable materials from work site to the nearest diposal
site(up to a lead of 10 km ) and disposing the same in disposal pits or borrow areas
including deposing unserviceable materials in layers and manual compaction as per
Technical Specification Clause.111
|
Cum
|
37,996
|
37,888.25
|
|
B). The 30 cm top layer of disposal pit shall be provided with good earth, suitable
for development of vegetation/plantation. All work shall be carried out as
per specification and approval of the Engineer in Charge as per Technical Specification
Clause.111
|
Sqm
|
163,700
|
162,800
|
11.02
|
Turfing at ground level at disposal pits for un-serviceable material as per specifications
and approval of the engineer in charge as per Technical Specification Clause.111
|
Sqm
|
163,700
|
77,995
|
11.03
|
Regular water sprinkling ( at least 4 times) per day at all construction sites for
suppression of visible dust levels as per Technical specification clause 111
|
Km
|
75
|
74
|
11.04
|
Construction of recharge pits within the selected water bodies along the project
road as per approved design and Drawing as developed by central ground water board
asper tech. Spec clause 111 and as per Drawing No U/T/17
|
No
|
31
|
31
|
11.05
|
Construction of silt traps at the discharge points of channels into to fresh water
bodies across the project road as per the Standard Details provided in the as per
Technical Specification Clause. 111 and as per Drawsing no. U/T/16
|
M
|
31
|
31
|
11.06
|
Providing informatory sign boards (Informatory/caution messages)for road users for
providing information about ecologically sensitive areas, wild life crossing points
(if any), important tourist locations, etc as applicable. The specification of sign
boards shall conform to relevant IRC specifications. The locations for Informatory
sign boards are given in as per Technical Specification Clause. 111
|
Sqm
|
4
|
-
|
11.07
|
Construction of 30cm thick clay lined (at bottom and sides) pits for safe disposal
of scarified bitumen including carriage (up to a lead of 10km). Depositing bitumen
in layers of 15 cms with manual compaction and covering the pit with 20cm thick
good earth as top layer at ground level all complete as per Typical Drawing as per
Technical Specification Clause. 111 and as per Drawing no. U/T/17
|
Nos
|
48
|
22
|
11.08
|
Turfing at ground level at disposal pits for Scarified Bitumen as per specifications
and approval of the Engineer in Charge
|
Sqm
|
16,200
|
7,425
|
11.11
|
Periodic Air quality monitoring during construction stage at construction camp sites,
bitumen hot mix plants, crusher plants (if specifically established for Project)
at major settlement areas along project road.
|
No
|
42
|
42
|
11.12
|
Utilisation of un serviceable material obtained from the road way excavation for
widening and construction of cross roads as per technical specification
|
Cum
|
6,640
|
3,309
|
11.13
|
Water quality monitoring during constructrion phase The sampling shall be carried
out once in four months for 2 years and cover all parameters as per ISI0500 including
heavy metals
|
Nos.
|
48
|
37
|
11.14
|
Noise quality monitoring atspecified silent receptors along Project Road, at construction
camp sites, bitumen hot mix plants, crusher plants
|
Nos.
|
42
|
42
|
11.15
|
Soil quality monitoring at construction camp sites, work shop areas, oil/lubricant
handling areas, bitumen hot mix plants, at all parking lay byes, vehicle servicing
stations
|
Nos.
|
60
|
23
|
11.16
|
Providing Oil Interceptors at the fuel/oil storage camps or Construction camps as
per Typical Drawing and as per Technical Specification Clause. 111 and as per Drawing
no. U/T.20
|
Nos.
|
2
|
-
|
11.17
|
Providing Personal Protective Equipment to labours during construction Phase of
the project as per Technical Specification Clause. 111
|
Cost/Person/annum
|
200
|
200
|
11.18
|
Provision for two health check ups for the carcinogens from bituminous fumes, which
may inhaled during road paving works. The first health check up prior to
induction of the personnel into the construction works and the last health check
up prior to the discharge of the personnel from the construction works as per Technical
Specification Clause. 111
|
Cost/person
|
200
|
30
|