Bill of Quantities
Sl No Description Unit Plannned BoQ Quantity Approved Quantity
BILL N0.10 - SAFETY IN ROAD CONSTRUCTION ZONE
10.01 Supplying and fixing sign boards including the cost of posts, fixture foundation, fitting and fixing. Sheeting will be made of encapsulated lens type of Retro-reflective type and messages/ borders will be screen printed complete as per Technical Specification Clauses 112 & 801 and as directed by Engineer
  Octagonal 900x 900 mm No. 20 5
  Circular 600 dia No. 15 19
  Informatory as per drawing Sq.m 30 16.2
  Cautionary warning signs (Triangular 900 sides) No. 15 9
10.02 Providing of red fluorescent with white reflective sleeve traffic cone made of low density polyethylene(LDPE) material with a square base of 90x390x35mm and a height of 770mm, 4Kg in weight, placed at l.Sm ntcrval, all as per BS 873 including cost of all materials, labour, loading, unloading, lead, lift, transporting etc complete Technical Specification Cl. 1 12 & IRC SP 55-2001 No. 150 50
10.03 Installation of a steel portable barricade with horizontal rail 300mm wide, 25m in length fitted on a frame made with 45X45X5 mm angle iron section, 1.5m in height, horizontal rail painted(2coat) with yellow and white strips, 150mm in width at angle of 45degree, A frame painted with 2 coats of yellow paint, complete as per IRC:SP:55-2001 including cost of al1 materials, labour, loading, unloading, lead, lift, transporting etc Complete;. as per Technical specification Cl. 112 No. 50 -
10.04 Provision of metal drum/empty bitumen drum delineator, 300mm in diameter,800mm high, filled with earth for stability, painted in circumferential strips of alternate black and white 100mm wide 2 coats ted with reflectors 3 Nos of 7.5cm dia, all as per IRC:SP:55-2001 inluding cost of all materials, labour, loading, unloading, lead lift, transporting etc., complete as per Technical Specification Cl. 112 No. 150 50
10.05 Providing plastic crash barrier as per drawing and per the directions of the Engineer(1000x490x780MM size)(LWH) as per Technical Specification Cl. 112 No. 75 50
10.06 Providing Barricading/Caution Tapes of High quality PVC tape tube type to Enclose construction area as per Technical Specification Cl. 112 Lm 2,500 800
Bill. No. 11. Implementation of Environmental Management Action Plan to be executed under Civil Works Contract
11.01 A.   Carting away the unserviceable materials from work site to the neare disposal site (up to a lead of 10km) and disposing the same in dispos pits or borrow areas including depositing unserviceable materials in laye and manual compaction as per Technical Specification Clause.111 Cum 33,962 8,000
  B.   The 30 cm top layer of disposal pit shall be provided with good eartl suitable for development of vegetation/plantation. All work shall b carried out as per specifications and approval of the Engineer in Charge as per Technical Specification Clause.111 Sq.m. 32,049 -
11.02 Turfing at ground level at disposal pits for un-serviceable material as per specifications and approval of the Engineer in Charge as per Technica Specification Clause.111 Sq.m 32,049 -
11.03 Regular water sprinkling (at least 4 times) per day at all construction sites or suppression of visible dust levels, s per Technical Specification Clause. 111 Km 29.00 9.255
11.04 Construction of Recharge pits within the selected water bodies along the iroject road as per approved design and drawing as developed by Central Ground Water Board as per Technical Specification Clause. 111 and as er Drawing no.U/T/16 Nos. 18 -
11.05 Construction of silt traps at the discharge points of channels into to fresh ater bodies across the project road as per the Standard Details providec n the as per Technical Specification Clause. 111 and as per Drawing O.UHV16 M 18 -
11.06 Providing Informatory sign boards (Informatory /caution messages) for oad users for providing information about ecologically sensitive areas, ild life crossing points (if any), important tourist locations, etc as pplicable. The specifications of sign boards shall conform to relevant 1C specifications. The locations for Informatory sign boards are given in per Technical Specification Clause. 111 Sq.m 2 -
11.07 Construction of 30cm thick clay lined (at bottom and sides) pits for safe disposal of scarified bitumen including carriage (up to a lead of 10km) depositing bitumen in layers of 15 cms with manual compaction am covering the pit with 20cm thick good earth as top layer at ground level all complete as per Typical Drawing   as per Technical Specification Clause. 111 and as per Drawing no.U/T/17 Nos 21 -
11.08 Turfing at ground level at disposal pits for scarified bitumen as pe specifications and approval of the Engineer in Charge. Sq.m 7,098 -
11.11 Periodic air quality monitoring during construction stage at construction Camp sites,   bitumen hot mix plants, crusher plants (if specifically stablished for Project), at major settlement areas along project road. The parameters to be monitored are SPM, RPM, S02, NQx and CO, Lead. Each' monitoring schedule shall be over a duration of 24 hours (in 8 hour Shifts), once in four months and for 2 Years. The tests are to conducted in accordance CPCB norms and as per Technical Specification Clause. 111 Nos. 48 12
11.12 Utilisation of unserviceable material obtained from Road way excavation for widening and construction of Cross roads as per Technical Specification Clause.111 Cum 2,000 -
11.13 Water quality monitoring during construction phase The sampling shall be carried out once in four months for 2 years and cover all parameters as pe IS 10500 including heavy metals as per Technical Specification Clause. 111 Nos. 18 3
11.14 Noise quality monitoring at specified silent receptors along Project Road at construction camp sites, bitumen hot mix plants, crusher plants( specifically established for Project), and at major settlement areas along Project road. - Each monitoring schedule shall be over a duration of 2hours (6Am to 6PM), once in four months and for 2 Years). The monitoring shall be carried out in accordance with CPCB norms at locations given as per Technical Specification Clause. 111 Nos. 48 29
11.15 Soil quality monitoring at construction camp sites, work shop areas oil/lubricant handling areas, bitumen hot mix plants, at all parking lay byes, vehicle servicing stations along Project Road. Parameters shal nclude Ph, Nitrogen, Phospor and carried out once in a quarter at all locations for 2 years as per details given as per Technical Specification Clause. 111 Nos. 28 3
11.16 Providing Oil Interceptors at the fuel/oil storage camps or Construction Camps as per Typical Drawing and as per Technical Specification Clause.111 and as per Drawing no.U/T/20 Nos. 1 -
11.17 Providing Personal Protective Equipment to labours during construction tiase of the project as per Technical Specification Clause. 111 Provision for two health check ups for the carcinogens from bituminous cost/ person/ annum 100 50
11.18 Provision for two health check ups for the carcinoens from bituminois fumes, which may inhaled during road paving works. The first health teck up prior to induction of the personnel into the construction works and the last health check up prior to the discharge of the personnel from the construction works as per Technical Specification Clause. 111 cost/ person 100 -