WEP4 ನ ಪರಿಸರ ನಿರ್ವಹಣೆ


Back As on 31-July-2015
Bill of Quantities
Sl No Description Unit Planned BoQ Quantity Approved Quantity
BILL NO. 10: SAFETY IN ROAD CONSTRUCTION ZONE
10.01 Supplying and fixing sign boards including the cost of posts, fixtures, foundation fitting and fixing, sheeting will be made of encapsulated lens type of Retro-reflective type and messages.      
a) Octagonal 900 x 900mm No. 40 40
b) Circular 600 dia No. 30 30
c) Informatory as per drawing Sqm 60 58.44
d) Cautionary warning sings ( Traingular 900 sides) No. 30 30
10.02 Providing of red fluorescent with white reflective sleeve traffic cone made of low density polyethylene (LDPE) material with a square base of 390 x 390 x 35mm and height of 770mm, 4 kg in weight, placed at 1.5m No. 300 285
10.03 Installation of a steel portable barricade with horizontal rail 300mm wide, 2.5m in length fitted on a frame made with 45x45x5 mm angle iron section, 1.5m in height horizontal rail painted (2coat) with yellow and white strips, 150mm in width at angle of 45 degree, Aframe painted with 2 coats of yellow paint, complete as per IRC:SP:55-2001 ncluding cost of all materials, labour, loading, unloading, lead, lift, transporting etc omplete sa per Technical Specification Cl.112 No 100 95
10.04 Provision of metal drum/empty bitumen drum delineator, 300mm in diameter,800mm high, filled with earth for stability, painted in circumferential strips of alternate black and white 100mm wide 2 coats fitted with reflectors 3 Nos of 7.5cm dia,all as per IRC:SP:55-2001 including cost of all materials, labour, loading, unloading lead lift, transporting etc., complete as per Technical Specification Cl.112 No 300 40
10.05 Providing plastic crash barrier as per drawing and per the directions of the Engineer (1000X490X780MM size)(LWH) as per Technical Specification Cl.112 No. 150 140
10.06 Providing Barricading/Caution Tapes of High quality PVC tape tube type to Enclose construction area as per Technical Specification Cl.112 Lm 5,000 5,000
BILL NO. 11: Implementation of environmental Management action plan to be executed under Civil works Contract
11.01 A) Carting away the unserviceable materials from work site to the nearest diposal site(up to a lead of 10 km ) and disposing the same in disposal pits or borrow areas including deposing unserviceable materials in layers and manual compaction as per Technical Specification Clause.111 Cum 37,996 37,888.25
  B). The 30 cm top layer of disposal pit shall be provided with good earth, suitable for development of vegetation/plantation.   All work shall be carried out as per specification and approval of the Engineer in Charge as per Technical Specification Clause.111 Sqm 163,700 162,800
11.02 Turfing at ground level at disposal pits for un-serviceable material as per specifications and approval of the engineer in charge as per Technical Specification Clause.111 Sqm 163,700 77,995
11.03 Regular water sprinkling ( at least 4 times) per day at all construction sites for suppression of visible dust levels as per Technical specification clause 111 Km 75 74
11.04 Construction of recharge pits within the selected water bodies along the project road as per approved design and Drawing as developed by central ground water board asper tech. Spec clause 111 and as per Drawing No U/T/17 No 31 31
11.05 Construction of silt traps at the discharge points of channels into to fresh water bodies across the project road as per the Standard Details provided in the as per Technical Specification Clause. 111 and as per Drawsing no. U/T/16 M 31 31
11.06 Providing informatory sign boards (Informatory/caution messages)for road users for providing information about ecologically sensitive areas, wild life crossing points (if any), important tourist locations, etc as applicable. The specification of sign boards shall conform to relevant IRC specifications.   The locations for Informatory sign boards are given in as per Technical Specification Clause. 111 Sqm 4 -
11.07 Construction of 30cm thick clay lined (at bottom and sides) pits for safe disposal of scarified bitumen including carriage (up to a lead of 10km). Depositing bitumen in layers of 15 cms with manual compaction and covering the pit with 20cm thick good earth as top layer at ground level all complete as per Typical Drawing as per Technical Specification Clause. 111 and as per Drawing no. U/T/17 Nos 48 22
11.08 Turfing at ground level at disposal pits for Scarified Bitumen as per specifications and approval of the Engineer in Charge Sqm 16,200 7,425
11.11 Periodic Air quality monitoring during construction stage at construction camp sites, bitumen hot mix plants, crusher plants (if specifically established for Project) at major settlement areas along project road. No 42 42
11.12 Utilisation of un serviceable material obtained from the road way excavation for widening and construction of cross roads as per technical specification Cum 6,640 3,309
11.13 Water quality monitoring during constructrion phase The sampling shall be carried out once in four months for 2 years and cover all parameters as per ISI0500 including heavy metals   Nos. 48 37
11.14 Noise quality monitoring atspecified silent receptors along Project Road, at construction camp sites, bitumen hot mix plants, crusher plants Nos. 42 42
11.15 Soil quality monitoring at construction camp sites, work shop areas, oil/lubricant handling areas, bitumen hot mix plants, at all parking lay byes, vehicle servicing stations   Nos. 60 23
11.16 Providing Oil Interceptors at the fuel/oil storage camps or Construction camps as per Typical Drawing and as per Technical Specification Clause. 111 and as per Drawing no. U/T.20 Nos. 2 -
11.17 Providing Personal Protective Equipment to labours during construction Phase of the project as per Technical Specification Clause. 111 Cost/Person/annum 200 200
11.18 Provision for two health check ups for the carcinogens from bituminous fumes, which may inhaled during road paving works.   The first health check up prior to induction of the personnel into the construction works and the last health check up prior to the discharge of the personnel from the construction works as per Technical Specification Clause. 111 Cost/person 200 30