BILL NO.10 - SAFETY IN ROAD CONSTRUCTION ZONE
|
10.01
|
Supplying and fixing sign boards including the cost of posts, fixtures,foundation,
fitting and fixing. Sheeting will be made of encapsulated lens type of Retro-reflective
type and messages/ borders will be screen printed complete as per Technical Specification
clause 112 & 801 and as directed by Engineer.
|
|
|
|
a
|
Octagonal 900x 900 mm type IX
|
No
|
20
|
-
|
b
|
Circular 600 dia type IX
|
No
|
15
|
6
|
c
|
Informatory as per drawing type IX
|
Sqm
|
30
|
4
|
d
|
Cautionary warning signs (Triangular 900 sides) Type IX
|
No
|
15
|
5
|
10.02
|
Providing of red fluorescent with white reflective sleeve traffic cone made of low
density polyethylene(LDPE) material with a square base of 390x390x35mm and a height
of 770mm, 4Kg in weight, placed at 1.5m
interval, all as per BS 873 including cost of all materials, labour, loading,
unloading, lead, lift, transporting etc complete Technical Specification
section clause 112 &801 & IRC SP 55-2001.
|
No
|
150
|
10
|
10.03
|
Installation of a steel portable barricade with horizontal rail 300mm wide, 2.5m
in length fitted on a frame made with 45X45X5 mm angle iron section, 1.5m in height,
horizontal rail painted(2coat) with yellow and white strips, 150mm in width at angle
of 45degree, A frame painted with 2 coats of yellow paint, complete as per IRC:SP:55-2001
including cost of all materials, labour, loading, unloading, lead, lift, transporting
etc complete. as per technical specification Cl.112
|
No
|
50
|
-
|
10.04
|
Provision of metal drum/empty bitumen drum delineator, 300mm in diameter, 800mm
high, filled with earth for stability, painted in circumferential strips of alternate
black and white 100mm wide 2 coats fitted with reflectors 3 Nos of 7.5cm dia, all
as per IRC:SP:55-2001 including cost of all materials, labour, loading, unloading,
lead lift, transporting etc., complete as per technical specification Cl.112
|
No
|
150
|
6
|
10.05
|
Providing plastic crash barrier as per drawing and per the directions of the Engineer(1000X490X780MM
size)(LWH) as per technical specification Cl.112
|
No
|
75
|
-
|
10.06
|
Providing Barricading/Caution Tapes of High quality PVC tape tube type to Enclose
construction area as per Technical Specification
|
Lm
|
2,500
|
1,350
|
BILL. NO. 11. IMPLEMENTATION OF ENVIRONMENTAL MANAGEMENT ACTION PLAN TO BE EXECUTED
UNDER CIVIL WORKS CONTRACT
|
11.01
|
A. Carting away the unserviceable materials from work site to the nearest disposal
site (up to a lead of 10km) and disposing the same in disposal pits or borrow areas
including depositing unserviceable materials in layers and manual compaction. as
per technical specification clause 111.14
|
Cum
|
18,068
|
-
|
|
B. The 30 cm top layer of disposal pit shall be provided with good earth, suitable
for development of vegetation/plantation. All work shall be carried out as per specifications
and approval of the Engineer in Charge. As per technical specification clasue 111
|
Sqm
|
117,649
|
-
|
11.02
|
Turfing at ground level at disposal pits for un-serviceable material as per specifications
and approval of the Engineer in Charge. As per technical specification cl.111
|
Sqm
|
32,049
|
-
|
11.03
|
Regular water sprinkling (at least 4 times) per day at all construction sites for
suppression of visible dust levels. As per technical specification cl.111
Note: This item is to be operated after the completion of earthwork to suppress
the visible dust levels. Cost of watering during compaction of earthwork is deemed
to be already covered under civil works.
|
Km
|
50
|
-
|
11.04
|
Construction of Recharge pits within the selected water bodies along the project
road as per approved design and drawing as developed by Central Ground Water Board
as per technical specification cl.111 and as per drawing no U/T/20
|
No
|
11
|
-
|
11.05
|
Construction of silt traps at the discharge points of channels into to fresh water
bodies across the project road as per the Standard Details provided As per technical
specification cl.111 and as per drawing no U/T/19
|
M
|
11
|
-
|
11.06
|
Providing informatory sign boards (informatory /caution messages) for road users
for providing information about ecologically sensitive areas, wild life crossing
points (if any), important tourist locations, etc as applicable. The specifications
of sign boards shall conform to relevant IRC specifications.
using type -IX sheeting the location for informatory sign boards are given
in as per technical specification cl.111
|
Sqm
|
4
|
-
|
11.07
|
Construction of 30cm thick clay lined (at bottom and sides) pits for safe disposal
of scarified bitumen including carriage (up to a lead of 10km), depositing bitumen
in layers of 15 cms with manual compaction and covering the pit with 20cm thick
good earth as top layer at ground level all complete as per Typical Drawing as per
technical specification cl.111
|
No
|
26
|
-
|
11.08
|
Turfing at ground level at disposal pits for scarified bitumen as per specifications
Cl.307 and approval of the Engineer in Charge.
|
Sqm
|
7,098
|
-
|
11.09
|
(Item No. 11.09 , Not Used)
|
|
|
|
11.10
|
(Item No. 11.10 , Not Used)
|
|
|
|
11.11
|
Periodic air quality monitoring during construction stage at construction camp sites,
bitumen hot mix plants, crusher plants (if specifically established for Project),
at major settlement areas along project road. The parameters to be monitored are
SPM, RPM, SO2, NOx and CO, Lead. Each monitoring schedule shall be over a duration
of 24 hours (in 8 hour shifts), once in a quarter and for 2 Years). The tests are
to conducted in accordance CPCB norms and as per tchnical specification Cl.111
|
No
|
30
|
6
|
11.12
|
Utilisation of unserviceable material obtained from Road way excavation for widening
and construction of Cross roads.
|
Cum
|
3,220
|
-
|
11.13
|
Water quality monitoring during construction phase at locations given in Appendix
. The sampling shall be carried out once in a quarter for 2 years and cover all
parameters as per IS10500 including heavy metals as per technical specification
Cl.111
|
No
|
24
|
6
|
11.14
|
Noise quality monitoring at specified silent receptors along Project Road, at construction
camp sites, bitumen hot mix plants, crusher plants(if specifically established for
Project), and at major settlement areas along project road. –Each monitoring schedule
shall be over a duration of 12hours (6Am to 6PM), once in a quarter and for 2 Years).
The monitoring shall be carried out in accordance with CPCB norms at locations as
per technical specification cl.111
|
No
|
30
|
7
|
11.15
|
Soil quality monitoring at construction camp/plant sites, Labour camps, Batching
plants and productive agricultural lands abutting traffic detours and traffic diversions
and major intersections along project road .Parameters shall include Ph,Nitrogen,Phosphorus,Potassium,Sodium,Chloride,Organic
Carbon and lead and carried out twice in a year (Pre and post monsoon) at all locations
for 2 years. As per technical specification clause.111.
|
No
|
36
|
2
|
11.16
|
Providing Oil Interceptors at the fuel/oil storage camps or Construction camps as
per technical specification clause-111 and as per drawing no U/T/21
|
No
|
1
|
-
|
11.17
|
Providing Personal Protective Equipment to labours during construction Phase of
the project as per technical specification Cl.111
|
cost/ person/
annum
|
100
|
-
|
11.18
|
Provision for two health check ups for the carcinogens from bituminous fumes, which
may inhaled during road paving works. The first health check up prior to induction
of the personnel into the construction works and the last health check up prior
to the discharge of the personnel from the construction works
|
cost/ person
|
100
|
-
|