BILL NO: 10 - Safety in Road Construction Zone |
10.01 |
Supplying and fixing sign boards including the cost of posts, fixgtures,
foundation, fitting and fixing, Sheeting wil be made of encapsulated lens type
of Retro-reflective type and messages/borders will be screen printed complete sa
per Technical Specification Clauses 112 & 801 and as directed by Engineer
Technical Specification Cl. 112 & IRC SP 55-2001 |
|
|
|
|
Octagonal 900 x 900 mm |
No |
40
|
37
|
|
Circular 600 dia |
No |
30
|
30
|
|
Informatory as per drawing |
Sqm |
60
|
48
|
|
Cautionary warning signs (Triangular 900 sides) |
No |
30
|
30
|
10.02 |
Providing of red fluorescent with white reflective sleeve traffic cone made of
low density polyetylene (LDPE) material with a swuare base of 390x390x35 mm and
a height of 770mm, 4 Kg in weight, placed at 1.5m interval, all as per BS 873
inc luding cost of all materials, labour, loading, unloading, lead, lift,
transporting etc complete Technical Specification Cl. 112 & IRC SP 55-2001 |
No |
300
|
300
|
10.03 |
Installation of a stell portable barricade with horizontal rail 300mm wide, 2.5m
in length fitted on a frame made with 45x45x5 mm angle iron section, 1.5m in
height horizontal rail painted (2coat) with yellow and white strips, 150mm in
width at angle of 45 degree, Aframe painted with 2 coats of yellow paint,
complete as per IRC:SP:55-2001 ncluding cost of all materials, labour, loading,
unloading, lead, lift, transporting etc omplete sa per Technical Specification
Cl.112 |
No |
100
|
29
|
10.04 |
Provision of metal drum/empty bitumen drum delineator, 300mm in diameter,800mm
high, filled with earth for stability, painted in circumferential strips of
alternate black and white 100mm wide 2 coats fitted with reflectors 3 Nos of
7.5cm dia,all as per IRC:SP:55-2001 including cost of all materials, labour,
loading, unloading lead lift, transporting etc., complete as per Technical
Specification Cl.112 |
No |
300
|
100
|
10.05 |
Providing plastic crash barrier as per drawing and per the directions of the
Engineer (1000X490X780MM size)(LWH) as per Technical Specification Cl.112 |
No |
150
|
150
|
10.06 |
Providing Barricading/Caution Tapes of High quality PVC tape tube type to
Enclose construction area as per Technical Specification Cl.112 |
Lm |
5,000
|
4,910
|
BILL NO: 11 - Implementation of Environmental Management Action Plan to be
executed under Civil Works Contract |
11.01 |
A. Carting away the unserviceable
materials from work site to the nearest disposal site (up to a lead of 10Km) and
disposing the same in disposal pits or borrow areas including depositing
unserviceable materials in layers and manual compaction as
per Technical Specification Clause. 111 |
Cum |
37,178
|
20,478
|
|
B. The 30 cm top layer of
disposal pit shall be provided with good earth, suitable for development of
vegetation/plantation. All work shall be
carried out as per specification and approval of the Engineer in Charge as per
Technical Specification Clause.111 |
Sqm |
185,890
|
337.5
|
11.02 |
Turfing at ground level at disposal pits for un-serviceable material as per
specifications and approval of the Engineer in Charge as per Technical
Specification Clause.111 |
Sqm |
185,890
|
-
|
11.03 |
Regular water sprinkling (at least 4 times) per day atall construction sites for
suppression of visible dust levels. as per Technical Specification Clause.111 |
KM |
52.440
|
50.187
|
11.04 |
Construction of recharge pits within the selected water bodies along the project
road as per approved design and Drawing as developed by central ground water
board asper tech. Spec clause 111 and as per Drawing No U/T/17 |
No |
17
|
6
|
11.05 |
Construction of silt traps at the discharge points of channels into to fresh
water bodies across the project road as per the Standard Details provided in the
as per Technical Specification Clause. 111 and as per Drawsing no. U/T/16 |
M |
17
|
-
|
11.06 |
Providing informatory sign boards (Informatory/caution messages)for road users
for providing information about ecologically sensitive areas, wild life crossing
points (if any), important tourist locations, etc as applicable.The specification of sign boards shall
conform to relevant IRC specifications. The locations for Informatory sign boards are given in as per Technical
Specification Clause. 111 |
Sqm |
4
|
-
|
11.07 |
Construction of 30cm thick clay lined (at bottom and sides) pits for safe
disposal of scarified bitumen including carriage (up to a lead of 10km).
Depositing bitumen in layers of 15 cms with manual compaction and covering the
pit with 20cm thick good earth as top layer at ground level all complete as per
Typical Drawing as per Technical Specification Clause. 111 and as per Drawing
no. U/T/17 |
Nos |
35.690
|
33
|
11.08 |
Turfing at ground level at disposal pits forScarified Bitumen
as per specifications and approval of the Engineer in Charge |
Sqm |
12,055
|
-
|
11.11 |
Periodic air quality monitoring during construction stage at construction camp
sites, bitumen hot mix plants, crusher plants (if specifically established for
Project) at major settlement areas along project road. The parameters to be monitored are SPM,
RPM, SO2, Nox and CO, Lead. Each monitoring schedule shall be over a duration of
24 hours (in 8 hour shifts), once in four months and for 2 Years. The tests are to conducted in accordance
CPCB norms and as per Technical Specificatin Clause.111 |
No |
90
|
63
|
11.12 |
Utilisation of un serviceable material obtained from the road way excavation for
widening and construction of cross roads as per technical specification |
Cum |
10,560
|
797.975
|
11.13 |
Water quality monitoring during constructrion phase The sampling shall be
carried out once in four months for 2 years and cover all parameters as per
ISI0500 including heavy metals as per Technical Specifications Clause. 111 |
Nos. |
48
|
25
|
11.14 |
Noise quality monitoring atspecified silent receptors along Project Road, at
construction camp sites, bitumen hot mix plants, crusher plants (if specifically
establizhedfor Project) and at major settlement areasalong project road - Each
monitoring schedule shall be over a duration of 12 hours (6AM to PM) once in
four months and for 2 Years). The monitoring shall be carried out in accordance
with CPCB norms at locations given as per Technical Specification Clause 111 |
Nos. |
90
|
65
|
11.15 |
Soil quality monitoring at construction camp sites, work shop areas,
oil/lubricant handling areas, bitumen hot mix plants, at all parking lay byes,
vehicle servicing stations along Project Road.Parameters shall include Ph, Nitrogen, Phosphor and carried out once in a
quarter at all locations for 2 years as per details given as per Technical
Specification Clause. 111 |
Nos. |
52
|
19
|
11.16 |
Providing Oil Interceptors at the fuel/oil storage camps or Construction camps
as per Typical Drawing and as per Technical Specification Clause. 111 and as per
Drawing no. U/T.20 |
Nos. |
2
|
-
|
11.17 |
Providing Personal Protective Equipment to labours during construction Phase of
the project as per Technical Specification Clause. 111 |
Cost/Person/annum |
200
|
200
|
11.18 |
Provision for two health check ups for the carcinogens from bituminous fumes,
which may inhaled during road paving works.The first health check up prior to induction of the personnel into the
construction works and the last health check up prior to the discharge of the
personnel from the construction works as per Technical Specification Clause. 111 |
Cost/person |
200
|
92
|