Land Acquisition for AEP9A



Back As on 31-Dec-2018



Sl.No Package No. Link No. Name of Link Total Survey
(As per Section 19)
Total Extent(As per Section19)
A-G
Govt Land Extent
A-G
Private Land required
(11 = 9-10)
Award Passed Payment Made Payment to be Made
Total Sy.No Govt. Land Beyond COI Actual Total Sy.No
8=5-(6+7)
Consent General Balance
14 = 11-(12+13)
Consent payment made Court Deposit made Consent Award
17 = (12-15)
General Award
18 = (13-16)
Sy No. Extent
A-G
Sy No. Extent
A-G
Sy No. Extent
A-G
Sy No. Extent
A-G
Sy No. Extent
A-G
Sy No. Extent
A-G
Sy No. Extent
A-G
Sy No. Extent
A-G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 AEP-9A 21-C Savadathi-Ramdurga 125 2 2 120 9-27 0-08 120 9-19 83 7-13 37 2-05 1 0-01 83 7-13 37 2-05 0 0-00 0 0-00
2 21-C Savadathi-Ramdurga 166 3 0 163 10-04 3/4 0-03 163 10-01 3/4 112 6-24 3/4 50 2-38 1 0-19 112 6-24 3/4 50 2-38 0 0-00 0 0-00
3 21-C Savadathi-Ramdurga 2 0 0 2 0-03 0-00 2 0-03 2 0-03 0 0-00 0 0-00 2 0-03 0 0-00 0 0-00 0 0-00
2 21-C Sirsangi Bypass 21 0 0 21 5-36 3/4 0-00 21 5-36 3/4 8 2-13 1/2 13 3-23 1/2 0 0-00 8 2-13 1/4 13 3-23 1/2 0 0-00 0 0-00